Cadeau & promotional packaging

Client gifting, staff rewards and seasonal campaigns — in your own branding.

Une pose à plat d'un gobelet isolé, gobelets en verre, un ouvre-bouteille, un caboteur, un cahier et un sac fourre-tout.

The problem in this trade

A promotional run has a fixed date and a moving quantity. Artwork is approved late, the list of recipients changes, and everything has to land before the event rather than after it. What makes these runs work is a construction that repeats identically at volume, and a supplier who can also supply the thing inside the box.

Matériels & compliance

Repeatability The same construction run to run, so campaign two matches campaign one
Quantity tiers 1,000–4 999 · 5 000-9 999 · 10,000+ pièces, so a bigger run prices differently
Contents We supply the promotional product as well as the box — drinkware, barware, branded merchandise
Branding Your artwork across the lid, the insert or a belly band
Finitions Marquage à chaud · Gaufrage & estampage · Spot UV · Plastification soft-touch
Personalisation Per-recipient cards can be added inside the box before it is sealed
Commande minimale 1,000 pièces, par niveaux de 1 000 à 4 999, 5,000–9 999 et 10,000+ pièces
Lead time 15–30 days production · 7 days for a sample · sample cost on request

Promotional gifting runs on a date. Artwork is approved late, the quantity moves, and it all has to land before the event. What makes those runs work is a construction that repeats cleanly at volume and one supplier who can also supply what goes inside the box.

That is the part most buyers do not expect from a packaging supplier: we can supply the promotional product as well as the box, so a campaign arrives on one purchase order instead of three.

Questions courantes

Can you supply the gift as well as the box?
Yes — drinkware, verrerie, bar tools and branded merchandise. A promotional set can arrive on one purchase order rather than three.
Can we add a printed card per recipient?
Oui. Cards can be placed inside the box before it is sealed.
Will a second campaign match the first?
Oui, if it uses the same construction. The die line is stored, so a repeat run reproduces it.
Can the quantity change late?
The order tiers are 1,000–4,999, 5,000–9 999 et 10,000+ pièces, so a change usually moves the price rather than the construction — but confirm it early, because production lead time is 15–30 days.
Quelle est la commande minimum?
1,000 pièces, par niveaux de 1 000 à 4 999, 5,000–9 999 et 10,000+ pièces.

Want this built for your brand?

Envoyer le produit, la quantité et le marché sur lequel vous vendez. Nous répondons avec un cahier des charges et un devis.

← Back to all solutions  · Rechercher par style de boîte

Demander un devis

Facultatif, mais c'est généralement le moyen le plus rapide de régler une spécification.
Ce qui se passe dans l'ensemble? Cochez tout ce qui vous intéresse. Je ne suis pas encore sûr que ce soit une très bonne réponse.

Nous répondons depuis notre boîte de réception AEST. Mon–Fri, 9:00–17:00 AEST (Sidney).